Construction on the TWO new beach volleyball courts - located in a new cleared area down by the lake - has begun. This project is part of the overall redesign for the waterfront area that will create a lot more usable space for recreation and relaxing at camp's most beautiful spot. The entire waterfront redesign will be done in two years with the volleyball court, new dock system and lower camp water drainage system being completed before this coming summer.
The new water drainage system (while mostly a "behind the scenes" improvement) will drastically improve the grass and shore front by lower camp cabins and the lake. Manitou works with local groups to maintain and improve the water quality of its lake, and the new water drainage system will help tremendously.
You need flash player!